HOME | LOBO, TEXAS | NEWS | CITYMAP | INFRASTRUCTURE | FRIENDS OF LOBO | PHOTO GALLERY | LINKS | SERVICE 
    Fri Sep. 5, 2008 - 2:40 pm CT - Weather Conditions: 78°F (26°C) Partly cloudy
News
saasfee* music video
Lobo in the news:
Desert-Mountain Times
Lobo in the news:
Big Bend Sentinel
Lobo Motion
Lobo in the news:
Big Bend Sentinel
Lobo Make - Bobos Take
Electricity
New wells
New roofs
Mini-swimming pool
Living desert -
animals in Lobo
Shopping in and
around Van Horn
New wells put into operation

New wells put into operation (c) 2002 Lobo,Tx
The attempt to reactivate the well near the gas station failed. The well collapsed while the well contractor tried to pull the old water pipe out. The second well in the rear of the property, previously used for irrigation, was still in good condition, however 240 ft. of new pipe were needed. A jet pump, which can supply Lobo with 20 gallons of water per minute at 60 PSI, was connected to the end of the pipe at a depth of 240 ft. The following day, Honorary Citizen, Terry Williams finished the clean up of the bathhouse (6 showers, 8 toilets, 2 sinks). She was also able to clear out all the sewer lines, so that everyone could take a hot shower at the end of the working day.

New wells put into operation (c) 2002 Lobo,Tx
New wells put into operation (c) 2002 Lobo,Tx
New wells put into operation (c) 2002 Lobo,Tx

Clay is dug out of septic system:

Clay is dug out of septic system (c) 2002 Lobo,Tx

Our neighbor, Rolan, came over the next day with a backhoe and helped dig out the clay, which had been accumulating for over ten years.

Clay is dug out of septic system (c) 2002 Lobo,Tx

Clay is dug out of septic system (c) 2002 Lobo,Tx
Clay is dug out of septic system (c) 2002 Lobo,Tx
Clay is dug out of septic system (c) 2002 Lobo,Tx



Terms of use | Copyright | Legal | Site Map | Top